Progress continues in the village. The tile roofing is being installed on the detached single family home, and work continues on the parking garage. I don't know what the two poles are that he been erected on the sides of the street, unless it it a height restriction barricade for the garage, but I doubt that is the case.The second picture shows that the stone retaining wall near another homesite has been torn down and replaced with cinder blocks. There must be a drainage issue or poor support provided by the original wall. The third picture shows the outdoor living area on the second floor of one of the attached town homes.